๐Ÿข
Is this your business?

Claim this free listing to add your logo, contact details, services and more -- it only takes 2 minutes.

Claim This Listing โ†’
Manufacturer Unclaimed

Ferno (UK) Ltd

Patient handling and emergency medical equipment solutions

Cleckheaton, BD19 4TZ Est. 1971 51-100

About

Ferno is a global manufacturer of patient handling and emergency medical equipment with a UK subsidiary. Products include stretchers, cots, rescue equipment and immobilisation devices used by emergency services, hospitals and military worldwide. The UK operation supports the NHS and emergency services with both product supply and service.

Disciplines

Manufacturing EngineeringMechanical Engineering

Location

Ferno House, Stubs Beck Lane, Cleckheaton, BD19 4TZ

Frequently Asked Questions

How do I get in touch to discuss a project?
Use the enquiry form on this profile to start a conversation with Ferno (UK) Ltd. The team will typically come back to you quickly to discuss whether your project is a good fit and what the next steps would look like.
Do you handle both design and manufacturing, or just one?
Ferno (UK) Ltd provides focused expertise in Manufacturing Engineering. Some projects are end-to-end while others slot in at a specific stage in the client's existing process u2014 the team is flexible about where it adds the most value.
Do you provide material certificates and inspection reports?
Ferno (UK) Ltd provides material traceability and inspection documentation as standard for compliance-sensitive applications. The level of documentation is agreed at quotation stage to match the customer's requirements.
Can you assist with pressure vessel or pipework design to ASME or PED standards?
Yes u2014 design of pressure-containing equipment to recognised codes forms part of the Manufacturing Engineering work at Ferno (UK) Ltd. The team keeps current with applicable directives and guides clients through the compliance process.
How do you ensure quality on every project?
Quality at Ferno (UK) Ltd is built into the project process rather than checked at the end u2014 upfront scope definition, peer review of technical outputs, and formal handover documentation are standard on every engagement.